...
Seamless Pattern | Auctus Management Group

Barnetby’s Sidings Vegetation Removal

RSS INFRASTRUCTURE (RSS) Limited have been working alongside Colas Rail in order to remove various different types of vegetation species located on the Barnetby line.

The company undertook a pre-site visit in order to identify the scope of the works and identify potential hazards before deploying a dedicated clearance team. The contract began on the 19th September 2016 along the 4 number roads Siding’s which is adjacent to the MAC3 at 94m20ch and took around four days to complete. The team consisted of a Controller of Site Safety and Ground Operatives who removed the vegetation along the downside, which consisted mainly of Buddleia, Rowan Saplins and various other weed types. A defoliate was put in place to reduce future impact on the line and provide a hazard-free environment from which to operate allowing Colas Rail maintenance teams to begin work onsite.
Upon completion of the project the operatives worked to ensure that the worksite was cleared of all debris, tools, plant, equipment and all protection equipment. Moreover, a site inspection was carried out by the Works Supervisor to ensure that all potential hazards were removed as well as confirming that the site was in good order.

Share this post

About Auctus

Auctus Management Group offers various services to the infrastructure sector, such as Arboriculture, Civils & Construction, Geofencing, Rail Operations, Safety-Critical Resource, Signalling & Telecoms, Track Warning Services, and Welding. We can also provide specialised training for the infrastructure industry.

RSS Infrastructure, a provider of infrastructure solutions, is also a member of the group.

Follow Us

Head Office

Useful Numbers

Sign Up

Stay up-to-date with the latest news from across the Auctus Management Group.

Newsletter(Required)

Disability Confident Leader

UK modern slavery act compliance and anti-slavery statement central register
Skip to content